Our Approach
Eight stages from the first conversation to a running plant. Each one has an owner, a written output and a point where you decide.
One team. One sequence. No gaps between contracts.
Projects demand more than equipment and execution - they need coordination, accountability and precise planning. At Aviforge, our integrated EPC approach brings every stage together through one team, one plan and a dependable supply chain.
- Eight stages, run as one plan
- A written output at every stage
- You decide at each gate

The eight stages, in order.
From the first study to a plant that is handed over and supported.
- 01
Requirement study
We establish what the plant must produce, the feed it makes, the site and the budget range.
6.1.1 - 02
Feasibility and project report
Capacity, process, layout, equipment list, civil scope and cost drivers, set out in writing.
6.1.2 - 03
Process and layout design
The line from intake to finished feed, and how material moves through the site.
6.1.3 - 04
Civil and structural design
The building and foundation scope, designed around the equipment it houses.
6.1.4 - 05
Equipment selection and supply
Machines chosen for the process, supplied with specification and documentation.
6.1.5 - 06
Erection
Our site team installs the equipment and structures to the design.
6.1.6 - 07
Commissioning and operator training
Trial running on the line, with your operators trained on it.
6.1.7 - 08
Handover and after-sales
The plant is handed over with its documents, and supported afterwards.
6.1.8
Nothing moves without your sign-off.
Four points in the project where work pauses until you approve.
- G1
Scope and budget
After the study.
- G2
Layout and equipment list
Before anything is ordered.
- G3
Start of erection
Before the site team begins.
- G4
Handover
When the plant is ready to run.